C3 truck hauling a Wolfe trencher at sunset

Building CriticalEnergy Infrastructure

Pipeline Construction. Environmental Restoration. Right-of-Way Excellence.

Aerial view of a restored corridor with erosion wattles

Featured Project

North Dakota Energy Corridor

120+ Miles
Mainline construction
Environmental restoration

View Project Details

The C3 Difference

More than construction.A stronger tomorrow.

  • Safety is the schedule

    A 100% safety commitment. Production does not outrank the right to stop the work.

  • Land left whole

    Restoration is planned before the first ditch. The corridor has to hold after we leave.

  • Support that stays

    24/7 project support — when the spread is moving and when the day changes.